Showing 1 - 5 results of 5 for search '(wine OR line) (software)*', query time: 0.03s Refine Results
  1. 1

    A REDESIGN LAYOUT TO INCREASE PRODUCTIVITY OF A COMPANY by Kitriastika, Vincentia, Tanaya, Prianggada Indra, Indrayadi, Yuki

    Published 2013
    “…The redesigning layout process will use SLP method and flow analysis while supported by analysis of assembly line balancing to optimize the layout. Regarding the evaluation process, ARENA software will be used to simulate and identify the bottleneck in the production process, and comparing the layout alternatives to decide the best layout. …”
    Get full text
    UMS Journal (OJS)
  2. 2

    [RETRACTED]Karakteristik Gangguan Tidur pada Usia Produktif dan Usia Pertengahan by Yahman, Soleh Amini, Purwanto, Setiyo, Anganti, Nisa Rachmah Nur

    Published 2021
    “…At this stage in the publication process, our plagiarism detection software did not identify any significant duplication of text. …”
    Get full text
    UMS Journal (OJS)
  3. 3

    ANALISA PENENTUAN INTERVAL WAKTU PERAWATAN KOMPONEN KRITIS PADA MESIN CARDING FA221B BERDASARKAN TIME TO FAILURE (Studi Kasus di PT. DELTA DUNIA TEKSTILE Karanganyar) by SULISTYAWAN, HENDRY GUNTUR

    Published 2010
    “…Dan selanjutnya untuk interval waktu rata – rata penggantian komponen tiap mesin per Line yaitu 635 jam atau sama dengan 26 hari.…”
    Get full text
    Thesis
  4. 4
  5. 5

    STUDI KASUS PERANCANGAN INSTALASI LISTRIK SOLO GRAND MALL by SAPUTRO, WAHYU ADI MULIA DWI

    Published 2009
    “…Setelah itu meggambar instalasi dalam bentuk diagram sigle line dengan menggunakan software AutoCAD. Hasil perancangan ini menunjukan bahwa, daya semu yang dibutuhkan untuk Solo Grand Mall adalah sebesar 1.559,9 kVA dengan pengaman arus pada MCB pusat sebesar 2500 A dengan operasional auto-manualcontrol tenaga motorres dan menggunakan penghantar NYFGbY 4 x 500 mm². …”
    Get full text
    Thesis