A REDESIGN LAYOUT TO INCREASE PRODUCTIVITY OF A COMPANY
This project is conducted in Company X, a passenger cars wheel producing company located in Sunter, North Jakarta. With a view of increasing the productivity of the company, the focus of this project will be redesigned the layout of the factory. The main problem encountered is that the goods are not...
Saved in:
Main Authors: | , , |
---|---|
Format: | UMS Journal (OJS) |
Language: | eng |
Published: |
Department of Industrial Engineering Universitas Muhammadiyah Surakarta
2013
|
Subjects: | |
Online Access: | https://journals.ums.ac.id/index.php/jiti/article/view/663 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1805342430069784576 |
---|---|
author | Kitriastika, Vincentia Tanaya, Prianggada Indra Indrayadi, Yuki |
author_facet | Kitriastika, Vincentia Tanaya, Prianggada Indra Indrayadi, Yuki |
author_sort | Kitriastika, Vincentia |
collection | OJS |
description | This project is conducted in Company X, a passenger cars wheel producing company located in Sunter, North Jakarta. With a view of increasing the productivity of the company, the focus of this project will be redesigned the layout of the factory. The main problem encountered is that the goods are not produced in single location, causing a considerable hindrance in terms of time and distance, and hence efficiency. The redesigning layout process will use SLP method and flow analysis while supported by analysis of assembly line balancing to optimize the layout. Regarding the evaluation process, ARENA software will be used to simulate and identify the bottleneck in the production process, and comparing the layout alternatives to decide the best layout. The best chosen layout according to the simulation and SLP method that supported with flow analysis and assembly line balancing will be used as the master draft layout that will be proposed to Company X. |
format | UMS Journal (OJS) |
id | oai:ojs2.journals.ums.ac.id:article-663 |
institution | Universitas Muhammadiyah Surakarta |
language | eng |
publishDate | 2013 |
publisher | Department of Industrial Engineering Universitas Muhammadiyah Surakarta |
record_format | ojs |
spelling | oai:ojs2.journals.ums.ac.id:article-663 A REDESIGN LAYOUT TO INCREASE PRODUCTIVITY OF A COMPANY Kitriastika, Vincentia Tanaya, Prianggada Indra Indrayadi, Yuki Systematic Layout Planning (SLP); flow analysis; assembly line balancing; productivity; simulation This project is conducted in Company X, a passenger cars wheel producing company located in Sunter, North Jakarta. With a view of increasing the productivity of the company, the focus of this project will be redesigned the layout of the factory. The main problem encountered is that the goods are not produced in single location, causing a considerable hindrance in terms of time and distance, and hence efficiency. The redesigning layout process will use SLP method and flow analysis while supported by analysis of assembly line balancing to optimize the layout. Regarding the evaluation process, ARENA software will be used to simulate and identify the bottleneck in the production process, and comparing the layout alternatives to decide the best layout. The best chosen layout according to the simulation and SLP method that supported with flow analysis and assembly line balancing will be used as the master draft layout that will be proposed to Company X. Department of Industrial Engineering Universitas Muhammadiyah Surakarta 2013-06-30 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion application/pdf https://journals.ums.ac.id/index.php/jiti/article/view/663 10.23917/jiti.v12i1.663 Jurnal Ilmiah Teknik Industri; Vol. 12, No. 1, Juni 2013; 83 - 95 Jurnal Ilmiah Teknik Industri; Vol. 12, No. 1, Juni 2013; 83 - 95 2460-4038 1412-6869 eng https://journals.ums.ac.id/index.php/jiti/article/view/663/402 Copyright (c) 2015 Jurnal Ilmiah Teknik Industri |
spellingShingle | Systematic Layout Planning (SLP); flow analysis; assembly line balancing; productivity; simulation Kitriastika, Vincentia Tanaya, Prianggada Indra Indrayadi, Yuki A REDESIGN LAYOUT TO INCREASE PRODUCTIVITY OF A COMPANY |
title | A REDESIGN LAYOUT TO INCREASE PRODUCTIVITY OF A COMPANY |
title_full | A REDESIGN LAYOUT TO INCREASE PRODUCTIVITY OF A COMPANY |
title_fullStr | A REDESIGN LAYOUT TO INCREASE PRODUCTIVITY OF A COMPANY |
title_full_unstemmed | A REDESIGN LAYOUT TO INCREASE PRODUCTIVITY OF A COMPANY |
title_short | A REDESIGN LAYOUT TO INCREASE PRODUCTIVITY OF A COMPANY |
title_sort | redesign layout to increase productivity of a company |
topic | Systematic Layout Planning (SLP); flow analysis; assembly line balancing; productivity; simulation |
topic_facet | Systematic Layout Planning (SLP); flow analysis; assembly line balancing; productivity; simulation |
url | https://journals.ums.ac.id/index.php/jiti/article/view/663 |
work_keys_str_mv | AT kitriastikavincentia aredesignlayouttoincreaseproductivityofacompany AT tanayaprianggadaindra aredesignlayouttoincreaseproductivityofacompany AT indrayadiyuki aredesignlayouttoincreaseproductivityofacompany AT kitriastikavincentia redesignlayouttoincreaseproductivityofacompany AT tanayaprianggadaindra redesignlayouttoincreaseproductivityofacompany AT indrayadiyuki redesignlayouttoincreaseproductivityofacompany |