Merencanakan konstruksi baja: jembatan komposit

Saved in:
Bibliographic Details
Main Author: MERENCANAKAN ..
Format: Book
Language:English
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000nam a22000007a 4500
001 4460
003 002319/UMS/95/P
005 20120331215403.0
006
007
008 080101t xxu||||| |||| 00| 0 eng d
040 |c UMS 
041 |a IND 
082 |a 693.7  |2 22 
090 |b 002319/UMS/95/P 
100 |a MERENCANAKAN ... 
245 |a Merencanakan konstruksi baja: jembatan komposit 
300 |a 16 p.; 30 cm 
650 |a KONSTRUKSI BAJA 
942 |2 ddc  |c BKS  |6 693_700000000000000 
999 |c 4460  |d 4460 
952 |0 1  |1 0  |2 ddc  |4 0  |6 693_700000000000000_MER_M  |7 1  |8 CAD  |9 11552  |a PUSAT  |b PUSAT  |c CAD  |d 1995-01-26  |e P  |k CAD  |o 693.7 Mer M   |p 95-02319  |t 1  |w 1995-01-26  |y BKSC 
952 |0 0  |1 0  |2 ddc  |4 0  |6 693_700000000000000_MER_M_TTH  |7 0  |8 SIRKU  |9 86627  |a PUSAT  |b PUSAT  |c CIRC  |d 2001-08-16  |e P  |k CIRC  |l 3  |o 693.7 Mer M tth.  |p 01-04008  |r 2024-01-16  |s 2013-04-23  |t c.2  |w 2001-08-16  |y BKS