Studi kelayakan proyek industri

Saved in:
Bibliographic Details
Main Author: SOEHARTO, Iman
Other Authors: SUMIHARTI, Yati [ed.]
Format: Book
Language:Indonesian
Published: Jakarta Erlangga 2005 2002
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000nam a22000007a 4500
001 41715
003 IDSkaUMS
007 ta
008 080101t20022005io ||||| |||| 00| 0 ind d
999 |c 41715  |d 41715 
020 |a 9796882396 
040 |c UMS 
041 |a IND 
082 |a 658.404  |2 22 
100 |a SOEHARTO, Iman  |9 4108  |9 24113 
245 |a Studi kelayakan proyek industri  |c Iman Soeharto; editor Yati Sumiharti 
260 |a Jakarta  |b Erlangga  |c 2005  |c 2002 
300 |a xvi, 484 p.;  |b bib.; ind.;   |c 25 cm 
504 |a 478-479 p. 
590 |a FEB 
650 |a MANAJEMEN KELAYAKAN PROYEK  |9 5703  |9 24114 
700 |a SUMIHARTI, Yati [ed.]  |9 90559 
942 |2 ddc  |c BKS  |6 658_404000000000000 
952 |0 0  |1 2  |2 ddc  |4 0  |6 658_404000000000000_SOE_S  |7 0  |8 SIRKU  |9 39601  |a PUSAT  |b PUSAT  |c CIRC  |d 2006-09-26  |e P  |k CIRC  |l 10  |o 658.404 Soe S  |p 06-02339  |r 2015-12-18  |s 2015-08-18  |t 4  |w 2006-09-26  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |6 658_404000000000000_SOE_S  |7 1  |8 CAD  |9 60533  |a PUSAT  |b PUSAT  |c CAD  |d 2006-09-26  |e P  |k CAD  |o 658.404 Soe S  |p 06-02336  |t 1  |w 2006-09-26  |y BKSC 
952 |0 0  |1 0  |2 ddc  |4 0  |6 658_404000000000000_SOE_S  |7 0  |8 SIRKU  |9 80079  |a PUSAT  |b PUSAT  |c CIRC  |d 2006-09-26  |e P  |k CIRC  |l 24  |m 1  |o 658.404 Soe S  |p 06-02338  |r 2020-06-25  |s 2020-02-25  |t 3  |w 2006-09-26  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |6 658_404000000000000_SOE_S  |7 0  |8 SIRKU  |9 80080  |a PUSAT  |b PUSAT  |c CIRC  |d 2006-09-26  |e P  |k CIRC  |l 24  |o 658.404 Soe S  |p 06-02337  |r 2018-10-23  |s 2018-10-20  |t 2  |w 2006-09-26  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |6 658_404000000000000_SOE_S  |7 0  |8 SIRKU  |9 120425  |a PUSAT  |b PUSAT  |c CIRC  |d 2007-03-30  |e P  |k CIRC  |l 8  |m 2  |o 658.404 Soe S  |p 07-00684  |r 2019-11-21  |s 2019-11-06  |t 5  |w 2007-03-30  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |6 658_404000000000000_SOE_S_2002  |7 0  |8 SIRKU  |9 142394  |a TILIB  |b TILIB  |d 2010-06-02  |e H  |k CIRC  |o 658.404 Soe S 2002  |p 10-01264  |r 2010-06-02  |t c.6  |w 2010-06-02  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |6 658_404000000000000_SOE_S_2002  |7 0  |8 SIRKU  |9 142435  |a TILIB  |b TILIB  |d 2010-06-04  |k CIRC  |o 658.404 Soe S 2002  |p 10-01323  |r 2010-06-04  |t c.7  |w 2010-06-04  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |6 658_404000000000000_SOE_S_2002  |7 0  |8 SIRKU  |9 217613  |a PUSAT  |b PUSAT  |c PROC  |d 2019-12-05  |e H. Edy  |k CIRC  |o 658.404 Soe S 2002  |p 19-02479  |r 2019-12-05  |t c.8  |w 2019-12-05  |y BKS