The 8th Habit: Melampaui Efektivitas, Menggapai Keagungan

Saved in:
Bibliographic Details
Main Author: COVEY, Stephen R
Format: Book
Language:Indonesian
Published: Jakarta Gramedia Pustaka Utama 2012
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000nam a22000007a 4500
001 40868
003 004202/UMS/05/P
005 20130102143926.0
008 080101t20052012io ||||| |||| 00| 0 ind d
020 |a 9792217010 
040 |c UMS 
041 |a IND 
082 |a 158.1  |2 22 
090 |b 004202/UMS/05/P 
100 |a COVEY, Stephen R  |9 23677 
245 |a The 8th Habit:  |b Melampaui Efektivitas, Menggapai Keagungan  |c Stephen R Covey 
260 |a Jakarta  |b Gramedia Pustaka Utama  |c 2012 
300 |a xv, 598 p.;   |b bib.; ind.;   |c 25 cm 
590 |a 160. 
650 |a PERBAIKAN DIRI, PSIKOLOGI TERAPAN  |9 23678 
650 |a MOTIVASI  |z PENGEMBANGAN DIRI  |9 23679 
942 |2 ddc  |c BKS  |6 158_100000000000000 
999 |c 40868  |d 40868 
952 |0 0  |1 0  |2 ddc  |4 0  |6 158_100000000000000_COV_E  |7 1  |8 CAD  |9 116074  |a PUSAT  |b PUSAT  |c CAD  |d 2005-12-19  |e P  |k CAD  |o 158.1 Cov E  |p 05-04202  |r 2014-10-17  |t 1  |w 2005-12-19  |y BKSC 
952 |0 0  |1 0  |2 ddc  |4 0  |6 158_100000000000000_COV_E  |7 0  |8 SIRKU  |9 116075  |a PUSAT  |b PUSAT  |c CIRC  |d 2005-12-19  |e P  |k CIRC  |l 9  |m 1  |o 158.1 Cov E  |p 05-04203  |r 2022-07-02  |s 2016-08-22  |t 2  |w 2005-12-19  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |7 0  |8 SIRKU  |9 116076  |a PUSAT  |b PUSAT  |c CIRC  |d 2005-12-19  |e P  |k CIRC  |l 12  |m 1  |o 158.1 Cov E  |p 05-04204  |r 2023-08-16  |s 2013-12-23  |t 3  |w 2005-12-19  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |7 0  |8 SIRKU  |9 116077  |a PUSAT  |b PUSAT  |c CIRC  |d 2005-12-19  |e P  |k CIRC  |l 8  |o 158.1 Cov E  |p 05-04205  |r 2024-06-10  |s 2016-02-29  |t 4  |w 2005-12-19  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |6 158_100000000000000_COV_E_2012  |7 0  |8 SIRKU  |9 158179  |a PUSAT  |b PUSAT  |c CIRC  |d 2013-01-02  |e P  |g 175000.00  |k CIRC  |l 10  |m 1  |o 158.1 Cov E 2012  |p 12-05377  |r 2024-05-13  |s 2018-04-30  |t c.5  |w 2013-01-02  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |6 158_100000000000000_COV_E_2012  |7 0  |8 SIRKU  |9 158180  |a PUSAT  |b PUSAT  |c CIRC  |d 2013-01-02  |e P  |g 175000.00  |k CIRC  |l 3  |o 158.1 Cov E 2012  |p 12-05378  |r 2024-05-18  |s 2016-12-08  |t c.6  |w 2013-01-02  |y BKS