Manajemen tenaga kerja Indonesia: pendekatan administratif dan operasional
Saved in:
Main Author: | |
---|---|
Format: | Book |
Language: | English |
Published: |
Jakarta
Bumi Aksara
2003
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000nam a22000007a 4500 | ||
---|---|---|---|
001 | 40033 | ||
003 | 001175/UMS/05/P | ||
005 | 20120402133803.0 | ||
006 | |||
007 | |||
008 | 080101t xxu||||| |||| 00| 0 eng d | ||
020 | |a 9795267779 | ||
040 | |c UMS | ||
041 | |a IND | ||
082 | |a 331.11 |2 22 | ||
090 | |b 001175/UMS/05/P | ||
100 | |a SASTROHADIWIRYO, B. Siswanto | ||
245 | |a Manajemen tenaga kerja Indonesia: pendekatan administratif dan operasional | ||
260 | |a Jakarta |b Bumi Aksara |c 2003 | ||
300 | |a xiii, 326 p.; bib.; ill.; 23 cm | ||
590 | |a 42. | ||
650 | |a TENAGA KERJA, MANAJEMEN TENAGA KERJA | ||
942 | |2 ddc |c BKS |6 331_110000000000000 | ||
999 | |c 40033 |d 40033 | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 331_110000000000000_SAS_M |7 1 |8 CAD |9 112858 |a PUSAT |b PUSAT |c CAD |d 2005-04-08 |e P |k CAD |o 331.11 Sas M |p 05-01175 |r 2017-10-19 |t 1 |w 2005-04-08 |y BKSC | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 331_110000000000000_SAS_M |7 0 |8 SIRKU |9 112859 |a PUSAT |b PUSAT |c CIRC |d 2005-04-08 |e P |k CIRC |l 29 |m 1 |o 331.11 Sas M |p 05-01176 |r 2022-10-06 |s 2021-12-11 |t 2 |w 2005-04-08 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 331_110000000000000_SAS_M |7 0 |8 SIRKU |9 112860 |a PUSAT |b PUSAT |c CIRC |d 2005-04-08 |e P |k CIRC |l 29 |m 2 |o 331.11 Sas M |p 05-01177 |r 2022-10-29 |s 2021-01-23 |t 3 |w 2005-04-08 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 331_110000000000000_SAS_M |7 0 |8 SIRKU |9 112861 |a PUSAT |b PUSAT |c CIRC |d 2005-04-08 |e P |k CIRC |l 27 |m 2 |o 331.11 Sas M |p 05-01178 |r 2022-11-01 |s 2022-09-22 |t 4 |w 2005-04-08 |y BKS |