Organisasi jilid 2: perilaku, struktur, proses.-- ed.8/penerjemah Nunuk Adiarni 2
Saved in:
Main Author: | |
---|---|
Other Authors: | , |
Format: | Book |
Language: | English |
Published: |
Jakarta
Binarupa Aksara
1997
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000nam a22000007a 4500 | ||
---|---|---|---|
001 | 31595 | ||
003 | 004117/UMS/97/P | ||
005 | 20120331221339.0 | ||
006 | |||
007 | |||
008 | 080101t xxu||||| |||| 00| 0 eng d | ||
040 | |c UMS | ||
041 | |a IND | ||
082 | |a 658.1 |2 22 | ||
090 | |b 004117/UMS/97/P | ||
100 | |a GIBSON, James L | ||
245 | |a Organisasi jilid 2: perilaku, struktur, proses.-- ed.8/penerjemah Nunuk Adiarni |n 2 | ||
260 | |a Jakarta |b Binarupa Aksara |c 1997 | ||
300 | |a xii, 422 p.; ill.; 23 cm | ||
590 | |a 24.9 | ||
650 | |a ORGANISASI | ||
700 | |a IVANCEVICH, John M | ||
700 | |a DONNELLY, James H | ||
942 | |2 ddc |c BKS |6 658_100000000000000 | ||
999 | |c 31595 |d 31595 | ||
952 | |0 1 |1 0 |2 ddc |4 0 |6 658_100000000000000_GIB_O_1997 |7 1 |8 CAD |9 58800 |a PUSAT |b PUSAT |c CAD |d 1997-06-17 |e P |k CAD |o 658.1 Gib O 1997 |p 97-04117 |r 2014-11-24 |t c.1 |w 1997-06-17 |y BKSC | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 658_100000000000000_GIB_O |7 0 |8 SIRKU |9 58801 |a PUSAT |b PUSAT |c CIRC |d 1997-06-17 |e P |k CIRC |l 11 |o 658.1 Gib O |p 97-04118 |r 2019-03-18 |s 2019-03-04 |t 2 |w 1997-06-17 |y BKS | ||
952 | |0 0 |1 1 |2 ddc |4 0 |7 0 |8 SIRKU |9 58802 |a PUSAT |b PUSAT |c CIRC |d 1997-06-17 |e P |k CIRC |o 658.1 Gib O |p 97-04119 |t 3 |w 1997-06-17 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 658_100000000000000_GIB_O |7 0 |8 SIRKU |9 58803 |a PUSAT |b PUSAT |c CIRC |d 1997-06-17 |e P |k CIRC |l 21 |m 2 |o 658.1 Gib O |p 97-04121 |r 2016-12-20 |s 2015-06-25 |t 5 |w 1997-06-17 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 658_100000000000000_GIB_O |7 0 |8 SIRKU |9 58804 |a PUSAT |b PUSAT |c CIRC |d 1997-06-17 |e P |k CIRC |l 12 |m 1 |o 658.1 Gib O |p 97-04120 |r 2017-11-23 |s 2017-02-22 |t 4 |w 1997-06-17 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |7 0 |8 SIRKU |9 86245 |a PUSAT |b PUSAT |c CIRC |d 2001-07-28 |e P |k CIRC |l 9 |m 2 |o 658.1 Gib O |p 97-03697 |r 2018-02-26 |s 2017-05-05 |t 6 |w 2001-07-28 |y BKS |