Manajemen proyek (dari konseptual sampai operasional) jilid 1 konsep, studi kelayakan, dan jaringan kerja v.1
में बचाया:
मुख्य लेखक: | |
---|---|
स्वरूप: | पुस्तक |
भाषा: | Indonesian |
प्रकाशित: |
Jakarta
Erlangga
1999
|
संस्करण: | Ed.2 |
विषय: | |
टैग: |
टैग जोड़ें
कोई टैग नहीं, इस रिकॉर्ड को टैग करने वाले पहले व्यक्ति बनें!
|
MARC
LEADER | 00000nam a22000007a 4500 | ||
---|---|---|---|
001 | 30225 | ||
003 | IDSkaUMS | ||
005 | 20140502130932.0 | ||
007 | ta | ||
008 | 080101t1999 io ||||| |||| 00| 0 ind d | ||
020 | |a 9794117242 | ||
040 | |c UMS | ||
041 | |a IND | ||
082 | |a 658.404 |2 22 | ||
100 | |a SOEHARTO, Iman |9 4108 |9 47985 | ||
245 | |a Manajemen proyek (dari konseptual sampai operasional) jilid 1 |n v.1 |b konsep, studi kelayakan, dan jaringan kerja |c Imam Soeharto | ||
250 | |a Ed.2 | ||
260 | |a Jakarta |b Erlangga |c 1999 | ||
300 | |a xvi, 356 p.; ind.; 25 cm | ||
590 | |a F. Teknik/Industri | ||
590 | |a F. Ekonomi dan Bisnis/Management | ||
650 | |a MANAJEMEN PROYEK |9 47986 | ||
942 | |2 ddc |c BKS |6 658_404000000000000 | ||
999 | |c 30225 |d 30225 | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 658_404000000000000_SOE_M |7 1 |8 CAD |9 76939 |a PUSAT |b PUSAT |c CAD |d 2000-03-21 |e P |k CAD |o 658.404 Soe M |p 00-00442 |r 2011-05-18 |t 1 |w 2000-03-21 |y BKSC | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 658_404000000000000_SOE_M |7 0 |8 SIRKU |9 76940 |a PUSAT |b PUSAT |c CIRC |d 2000-03-21 |e P |k CIRC |l 18 |m 1 |o 658.404 Soe M |p 00-00443 |r 2018-03-06 |s 2018-02-28 |t 2 |w 2000-03-21 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 658_404000000000000_SOE_M |7 0 |8 SIRKU |9 76941 |a PUSAT |b PUSAT |c CIRC |d 2000-03-21 |e P |k CIRC |l 24 |m 5 |o 658.404 Soe M |p 00-00444 |r 2019-03-14 |s 2018-08-02 |t 3 |w 2000-03-21 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 658_404000000000000_SOE_M |7 0 |8 SIRKU |9 76942 |a PUSAT |b PUSAT |c CIRC |d 2000-03-21 |e P |k CIRC |l 16 |m 2 |o 658.404 Soe M |p 00-00445 |r 2018-10-02 |s 2018-09-08 |t 4 |w 2000-03-21 |y BKS | ||
952 | |0 0 |1 1 |2 ddc |4 0 |7 0 |8 SIRKU |9 89718 |a PUSAT |b PUSAT |c CIRC |d 2001-12-22 |e P |k CIRC |o 658.404 Soe M |p 01-06856 |t 5 |w 2001-12-22 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 658_404000000000000_SOE_M |7 0 |8 SIRKU |9 89719 |a PUSAT |b PUSAT |c CIRC |d 2001-12-22 |e P |k CIRC |l 7 |o 658.404 Soe M |p 01-06857 |r 2022-05-19 |s 2022-04-07 |t 6 |w 2001-12-22 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 658_404000000000000_SOE_M |7 0 |8 SIRKU |9 89720 |a PUSAT |b PUSAT |c CIRC |d 2001-12-22 |e P |k CIRC |l 3 |o 658.404 Soe M |p 01-06858 |q 2013-09-16 |r 2013-09-09 |s 2013-09-09 |t 7 |w 2001-12-22 |y BKS | ||
952 | |0 0 |1 1 |2 ddc |4 0 |7 0 |8 SIRKU |9 89721 |a PUSAT |b PUSAT |c CIRC |d 2001-12-22 |e P |k CIRC |o 658.404 Soe M |p 01-06859 |t 8 |w 2001-12-22 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 658_404000000000000_SOE_M_1999 |7 1 |8 SIRKU |9 150383 |a TILIB |b TILIB |c PROC |d 2011-11-18 |e P |k CIRC |o 658.404 Soe M 1999 |p 11-02904 |r 2011-11-18 |t c.9 |w 2011-11-18 |y BKS |