Cara menghitung design flood

Saved in:
Bibliographic Details
Main Author: INDONESIA, Departemen Pekerjaan Umum
Format: Book
Language:English
Published: Jakarta Departemen Pekerjaan Umum 1980-1992
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000nam a22000007a 4500
001 2881
003 010143/UMS/94/P
005 20120331215334.0
006
007
008 080101t xxu||||| |||| 00| 0 eng d
040 |c UMS 
041 |a IND 
082 |a 627  |2 22 
090 |b 010143/UMS/94/P 
100 |a INDONESIA, Departemen Pekerjaan Umum 
245 |a Cara menghitung design flood 
260 |a Jakarta  |b Departemen Pekerjaan Umum  |c 1980-1992 
300 |a ii, 48 p.; ill.; 28 cm 
590 |a 7.5 
650 |a TEKNIK HIDRAULIS, DESAIN 
942 |2 ddc  |c BKS  |6 627_000000000000000 
999 |c 2881  |d 2881 
952 |0 1  |1 0  |2 ddc  |4 0  |6 627_000000000000000_IND_C  |7 1  |8 CAD  |9 6262  |a PUSAT  |b PUSAT  |c CAD  |d 1994-12-09  |e P  |k CAD  |o 627 Ind C  |p 94-10143  |t 1  |w 1994-12-09  |y BKSC 
952 |0 0  |1 0  |2 ddc  |4 0  |6 627_IND_C  |7 0  |8 SIRKU  |9 100106  |a PUSAT  |b PUSAT  |c CIRC  |d 2003-03-19  |e P  |k CIRC  |l 1  |o 627 Ind C  |p 03-01684  |r 2015-06-11  |s 2015-06-04  |t 2  |w 2003-03-19  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |6 627_IND_C  |7 0  |8 SIRKU  |9 100107  |a PUSAT  |b PUSAT  |c CIRC  |d 2003-03-19  |e P  |k CIRC  |o 627 Ind C  |p 03-01685  |t 3  |w 2003-03-19  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |6 627_IND_C  |7 0  |8 SIRKU  |9 100108  |a PUSAT  |b PUSAT  |c CIRC  |d 2003-03-19  |e P  |k CIRC  |o 627 Ind C  |p 03-01686  |t 4  |w 2003-03-19  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |6 627_IND_C  |7 0  |8 SIRKU  |9 100109  |a PUSAT  |b PUSAT  |c CIRC  |d 2003-03-19  |e P  |k CIRC  |o 627 Ind C  |p 03-01687  |t 5  |w 2003-03-19  |y BKS