Standar metode pengukuran kinerja unit paket instalasiair kapasitas dibawah 5 liter per detik
Enregistré dans:
Auteur principal: | |
---|---|
Format: | Livre |
Langue: | English |
Publié: |
Bandung
Yayasan LPMB
1993
|
Sujets: | |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
MARC
LEADER | 00000nam a22000007a 4500 | ||
---|---|---|---|
001 | 27881 | ||
003 | 002439/UMS/03/P | ||
005 | 20120331221001.0 | ||
006 | |||
007 | |||
008 | 080101t xxu||||| |||| 00| 0 eng d | ||
040 | |c UMS | ||
041 | |a IND | ||
082 | |a 628.16 |2 22 | ||
090 | |b 002439/UMS/03/P | ||
100 | |a INDONESIA, Departemen Pekerjaan Umum | ||
245 | |a Standar metode pengukuran kinerja unit paket instalasiair kapasitas dibawah 5 liter per detik | ||
260 | |a Bandung |b Yayasan LPMB |c 1993 | ||
300 | |a i, 11 p.; 30 cm | ||
590 | |a 4.5 | ||
650 | |a AIR, INSTALASI, AIR BERSIH | ||
942 | |2 ddc |c BKS |6 628_160000000000000 | ||
999 | |c 27881 |d 27881 | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 628_160000000000000_IND_S |7 0 |8 SIRKU |9 100955 |a PUSAT |b PUSAT |c CIRC |d 2003-04-10 |e P |k CIRC |o 628.16 Ind S |p 03-02439 |t 4 |w 2003-04-10 |y BKS | ||
952 | |0 1 |1 0 |2 ddc |4 0 |6 628_160000000000000_IND_S |7 1 |8 CAD |9 100956 |a PUSAT |b PUSAT |c CAD |d 2003-04-10 |e P |k CAD |o 628.16 Ind S |p 03-02436 |t 1 |w 2003-04-10 |y BKSC | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 628_160000000000000_IND_S |7 0 |8 SIRKU |9 100957 |a PUSAT |b PUSAT |c CIRC |d 2003-04-10 |e P |k CIRC |o 628.16 Ind S |p 03-02437 |t 2 |w 2003-04-10 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 628_160000000000000_IND_S |7 0 |8 SIRKU |9 100958 |a PUSAT |b PUSAT |c CIRC |d 2003-04-10 |e P |k CIRC |o 628.16 Ind S |p 03-02438 |t 3 |w 2003-04-10 |y BKS |