Standar tata cara perhitungan harga satuan pekerjaandinding tembok dan plesteran untuk bangunan sederhana
Saved in:
Main Author: | |
---|---|
Format: | Book |
Language: | English |
Published: |
Bandung
Yayasan LPMB
1991
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000nam a22000007a 4500 | ||
---|---|---|---|
001 | 27843 | ||
003 | 002280/UMS/03/P | ||
005 | 20120331221000.0 | ||
006 | |||
007 | |||
008 | 080101t xxu||||| |||| 00| 0 eng d | ||
040 | |c UMS | ||
041 | |a IND | ||
082 | |a 721.2 |2 22 | ||
090 | |b 002280/UMS/03/P | ||
100 | |a INDONESIA, Departemen Pekerjaan Umum | ||
245 | |a Standar tata cara perhitungan harga satuan pekerjaandinding tembok dan plesteran untuk bangunan sederhana | ||
260 | |a Bandung |b Yayasan LPMB |c 1991 | ||
300 | |a iv, 16 p.; 30 cm | ||
590 | |a 7.5 | ||
650 | |a DINDING TEMBOK | ||
942 | |2 ddc |c BKS |6 721_200000000000000 | ||
999 | |c 27843 |d 27843 | ||
952 | |0 1 |1 0 |2 ddc |4 0 |6 721_200000000000000_IND_S |7 1 |8 CAD |9 100761 |a PUSAT |b PUSAT |c CAD |d 2003-04-05 |e P |k CAD |o 721.2 Ind S |p 03-02280 |t 1 |w 2003-04-05 |y BKSC | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 721_200000000000000_IND_S |7 0 |8 SIRKU |9 100762 |a PUSAT |b PUSAT |c CIRC |d 2003-04-05 |e P |k CIRC |o 721.2 Ind S |p 03-02281 |t 2 |w 2003-04-05 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 721_200000000000000_IND_S |7 0 |8 SIRKU |9 100763 |a PUSAT |b PUSAT |c CIRC |d 2003-04-05 |e P |k CIRC |o 721.2 Ind S |p 03-02282 |t 3 |w 2003-04-05 |y BKS | ||
952 | |0 1 |1 0 |2 ddc |4 0 |6 721_200000000000000_IND_S_1991 |7 0 |8 SIRKU |9 100764 |a PUSAT |b PUSAT |c CIRC |d 2003-04-05 |e P |k CIRC |l 1 |o 721.2 Ind S 1991 |p 03-02283 |r 2008-05-23 |s 2008-04-19 |t 4 |w 2003-04-05 |y BKS |