Tata cara perhitungan harga satuan pekerjaan kayu untukbangunan rumah dan gedung
Saved in:
Main Author: | |
---|---|
Format: | Book |
Language: | English |
Published: |
Jakarta
Badan Standarisasi Nasional
1994
|
Series: | SNI 03 - 3434 - 1994
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000nam a22000007a 4500 | ||
---|---|---|---|
001 | 27708 | ||
003 | 001776/UMS/03/P | ||
005 | 20120331220954.0 | ||
006 | |||
007 | |||
008 | 080101t xxu||||| |||| 00| 0 eng d | ||
040 | |c UMS | ||
041 | |a IND | ||
082 | |a 694 |2 22 | ||
090 | |b 001776/UMS/03/P | ||
100 | |a INDONESIA, Badan Standarisasi Nasional | ||
245 | |a Tata cara perhitungan harga satuan pekerjaan kayu untukbangunan rumah dan gedung | ||
260 | |a Jakarta |b Badan Standarisasi Nasional |c 1994 | ||
300 | |a i, 14 p.; 30 cm | ||
440 | |a SNI 03 - 3434 - 1994 | ||
590 | |a 6. | ||
650 | |a KONSTRUKSI KAYU | ||
942 | |2 ddc |c BKS |6 694_000000000000000 | ||
999 | |c 27708 |d 27708 | ||
952 | |0 1 |1 0 |2 ddc |4 0 |6 694_000000000000000_IND_T |7 1 |8 CAD |9 100214 |a PUSAT |b PUSAT |c CAD |d 2003-03-21 |e P |k CAD |o 694 Ind T |p 03-01776 |r 2014-09-25 |t 1 |w 2003-03-21 |y BKSC | ||
952 | |0 0 |1 0 |2 ddc |4 0 |7 0 |8 SIRKU |9 100215 |a PUSAT |b PUSAT |c CIRC |d 2003-03-21 |e P |k CIRC |o 694 Ind T |p 03-01777 |t 2 |w 2003-03-21 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |7 0 |8 SIRKU |9 100216 |a PUSAT |b PUSAT |c CIRC |d 2003-03-21 |e P |k CIRC |o 694 Ind T |p 03-01778 |t 3 |w 2003-03-21 |y BKS | ||
952 | |0 1 |1 0 |2 ddc |4 0 |6 694_000000000000000_IND_T |7 0 |8 SIRKU |9 100217 |a PUSAT |b PUSAT |c CIRC |d 2003-03-21 |e P |k CIRC |o 694 Ind T |p 03-01779 |t 4 |w 2003-03-21 |y BKS |z Box 79 |