Syarat-syarat untuk kapur bahan bangunan NI-7

Saved in:
Bibliographic Details
Main Author: INDONESIA, Yayasan Dana Normalisasi
Format: Book
Language:English
Published: Bandung Yayasan Dana Normalisasi Indonesia 1984
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000nam a22000007a 4500
001 27682
003 001696/UMS/03/P
005 20120331220953.0
006
007
008 080101t xxu||||| |||| 00| 0 eng d
040 |c UMS 
041 |a IND 
082 |a 691.5  |2 22 
090 |b 001696/UMS/03/P 
100 |a INDONESIA, Yayasan Dana Normalisasi 
245 |a Syarat-syarat untuk kapur bahan bangunan NI-7 
260 |a Bandung  |b Yayasan Dana Normalisasi Indonesia  |c 1984 
300 |a iii, 31 p.; ill.; 21 cm 
590 |a 3.75 
650 |a BAHAN BANGUNAN, KAPUR 
942 |2 ddc  |c BKS  |6 691_500000000000000 
999 |c 27682  |d 27682 
952 |0 1  |1 1  |2 ddc  |4 0  |6 691_500000000000000_IND_S_1984  |7 1  |8 CAD  |9 100129  |a PUSAT  |b PUSAT  |c CAD  |d 2003-03-19  |e P  |k CAD  |o 691.5 Ind S 1984  |p 03-01696  |t 1  |w 2003-03-19  |y BKSC 
952 |0 0  |1 0  |2 ddc  |4 0  |7 0  |8 SIRKU  |9 100130  |a PUSAT  |b PUSAT  |c CIRC  |d 2003-03-19  |e P  |k CIRC  |l 1  |m 1  |o 691.5 Ind S  |p 03-01697  |r 2012-10-04  |s 2012-09-19  |t 2  |w 2003-03-19  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |7 0  |8 SIRKU  |9 100131  |a PUSAT  |b PUSAT  |c CIRC  |d 2003-03-19  |e P  |k CIRC  |l 3  |o 691.5 Ind S  |p 03-01698  |r 2014-04-25  |s 2014-04-15  |t 3  |w 2003-03-19  |y BKS 
952 |0 1  |1 0  |2 ddc  |4 0  |6 691_500000000000000_IND_S  |7 0  |8 SIRKU  |9 100132  |a PUSAT  |b PUSAT  |c CIRC  |d 2003-03-19  |e P  |k CIRC  |l 1  |o 691.5 Ind S  |p 03-01699  |r 2012-04-05  |s 2011-11-02  |t 4  |w 2003-03-19  |y BKS