Indikator ekonomi: dasar perhitungan perekonomian Indo-nesia

Saved in:
Bibliographic Details
Main Author: WIDODO, Hg. Suseno Triyanto
Format: Book
Language:English
Published: Yogyakarta Kanisius 2001
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000nam a22000007a 4500
001 26286
003 003178/UMS/02/P
005 20120331220859.0
006
007
008 080101t xxu||||| |||| 00| 0 eng d
020 |a 9794132225 
040 |c UMS 
041 |a IND 
082 |a 330.9598  |2 22 
090 |b 003178/UMS/02/P 
100 |a WIDODO, Hg. Suseno Triyanto 
245 |a Indikator ekonomi: dasar perhitungan perekonomian Indo-nesia 
260 |a Yogyakarta  |b Kanisius  |c 2001 
300 |a 138 p.; bib.; 21 cm 
590 |a 12. 
650 |a EKONOMI INDONESIA 
942 |2 ddc  |c BKS  |6 330_959800000000000 
999 |c 26286  |d 26286 
952 |0 0  |1 0  |2 ddc  |4 0  |6 330_959800000000000_WID_I  |7 1  |8 CAD  |9 93168  |a PUSAT  |b PUSAT  |c CAD  |d 2002-05-08  |e P  |k CAD  |o 330.9598 Wid I  |p 02-03178  |r 2011-04-18  |t 1  |w 2002-05-08  |y BKSC 
952 |0 1  |1 0  |2 ddc  |4 0  |6 330_959800000000000_WID_I_2001  |7 0  |8 SIRKU  |9 93170  |a PUSAT  |b PUSAT  |c CIRC  |d 2002-05-08  |e P  |k CIRC  |l 24  |m 2  |o 330.9598 Wid I 2001  |p 02-03180  |r 2018-03-15  |s 2018-01-23  |t c.3  |w 2002-05-08  |y BKS  |z Hibah ke Tajdid Pendidikan Institute/2024 
952 |0 0  |1 0  |2 ddc  |4 0  |6 330_959800000000000_WID_I  |7 0  |8 SIRKU  |9 93171  |a PUSAT  |b PUSAT  |c CIRC  |d 2002-05-08  |e P  |k CIRC  |l 21  |o 330.9598 Wid I  |p 02-03181  |r 2022-06-28  |s 2022-06-10  |t 4  |w 2002-05-08  |y BKS 
952 |0 1  |1 0  |2 ddc  |4 0  |6 330_959800000000000_WID_I_2001  |7 0  |8 SIRKU  |9 93172  |a PUSAT  |b PUSAT  |c CIRC  |d 2002-05-08  |e P  |k CIRC  |l 31  |m 2  |o 330.9598 Wid I 2001  |p 02-03182  |r 2020-02-27  |s 2020-02-25  |t 5  |w 2002-05-08  |y BKS  |z Hibah ke Tajdid Pendidikan Institute/2024 
952 |0 0  |1 0  |2 ddc  |4 0  |6 330_959800000000000_WID_I  |7 0  |8 SIRKU  |9 94353  |a PUSAT  |b PUSAT  |c CIRC  |d 2002-05-30  |e P  |k CIRC  |l 33  |m 4  |o 330.9598 Wid I  |p 02-04478  |r 2022-05-28  |s 2022-04-28  |t 6  |w 2002-05-30  |y BKS 
952 |0 0  |1 0  |2 ddc  |4 0  |6 330_959800000000000_WID_I  |7 0  |8 SIRKU  |9 94354  |a PUSAT  |b PUSAT  |c CIRC  |d 2002-05-30  |e P  |k CIRC  |l 27  |m 3  |o 330.9598 Wid I  |p 02-04479  |r 2023-09-29  |s 2022-06-27  |t 7  |w 2002-05-30  |y BKS 
952 |0 0  |1 2  |2 ddc  |4 0  |6 330_959800000000000_WID_I_2001  |7 0  |8 SIRKU  |9 94355  |a PUSAT  |b PUSAT  |c CIRC  |d 2002-05-30  |e P  |k CIRC  |l 20  |m 2  |o 330.9598 Wid I 2001  |p 02-04480  |r 2013-02-25  |s 2013-02-25  |t c.8  |w 2002-05-30  |y BKS