Optimization of industrial unit processes.-- ed.2
Gardado en:
Autor Principal: | |
---|---|
Formato: | Libro |
Idioma: | English |
Publicado: |
Boca Raton
CRC Press
1999
|
Subjects: | |
Tags: |
Engadir etiqueta
Sen Etiquetas, Sexa o primeiro en etiquetar este rexistro!
|
MARC
LEADER | 00000nam a22000007a 4500 | ||
---|---|---|---|
001 | 26093 | ||
003 | 002066/UMS/02/P | ||
005 | 20120331220851.0 | ||
006 | |||
007 | |||
008 | 080101t xxu||||| |||| 00| 0 eng d | ||
020 | |a 9780849398735 | ||
040 | |c UMS | ||
041 | |a ENG | ||
082 | |a 670.42 |2 22 | ||
090 | |b 002066/UMS/02/P | ||
100 | |a LIPTAK, Bela G. | ||
245 | |a Optimization of industrial unit processes.-- ed.2 | ||
260 | |a Boca Raton |b CRC Press |c 1999 | ||
300 | |a 416 p.; bib.; ill.; ind.; 26 cm | ||
590 | |a 1.353 | ||
650 | |a PABRIK, PROSES OPERASI | ||
942 | |2 ddc |c BKS |6 670_420000000000000 | ||
999 | |c 26093 |d 26093 | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 670_420000000000000_LIP_O |7 1 |8 CAD |9 92057 |a PUSAT |b PUSAT |c CAD |d 2002-04-10 |e P |k CAD |o 670.42 Lip O |p 02-02066 |t 1 |w 2002-04-10 |y BKSC | ||
952 | |0 0 |1 0 |2 ddc |4 0 |7 0 |8 SIRKU |9 92186 |a PUSAT |b PUSAT |c CIRC |d 2002-04-12 |e P |k CIRC |l 1 |o 670.42 Lip O |p 02-02320 |r 2009-12-29 |s 2009-12-07 |t 2 |w 2002-04-12 |y BKSA | ||
952 | |0 0 |1 0 |2 ddc |4 0 |7 0 |8 SIRKU |9 92187 |a PUSAT |b PUSAT |c CIRC |d 2002-04-12 |e P |k CIRC |l 1 |o 670.42 Lip O |p 02-02321 |r 2009-12-07 |s 2009-11-20 |t 3 |w 2002-04-12 |y BKSA |