Perencanaan dan pemodelan transportasi
Furkejuvvon:
Váldodahkki: | |
---|---|
Materiálatiipa: | Girji |
Giella: | English |
Almmustuhtton: |
Bandung
ITB
1997
|
Fáttát: | |
Fáddágilkorat: |
Lasit fáddágilkoriid
Eai fáddágilkorat, Lasit vuosttaš fáddágilkora!
|
MARC
LEADER | 00000nam a22000007a 4500 | ||
---|---|---|---|
001 | 20319 | ||
003 | 002464/UMS/98/P | ||
005 | 20120331220521.0 | ||
006 | |||
007 | |||
008 | 080101t xxu||||| |||| 00| 0 eng d | ||
020 | |a 9798591674 | ||
040 | |c UMS | ||
041 | |a IND | ||
082 | |a 629.04 |2 22 | ||
090 | |b 002464/UMS/98/P | ||
100 | |a TAMIN, Ofyar Z | ||
245 | |a Perencanaan dan pemodelan transportasi | ||
260 | |a Bandung |b ITB |c 1997 | ||
300 | |a 14a, 451 p.; 25 cm | ||
590 | |a 27.5 | ||
650 | |a TEKNIK TRANSPORTASI | ||
942 | |2 ddc |c BKS |6 629_040000000000000 | ||
999 | |c 20319 |d 20319 | ||
952 | |0 1 |1 0 |2 ddc |4 0 |6 629_040000000000000_TAM_P_1998 |7 1 |8 CAD |9 65079 |a PUSAT |b PUSAT |c CAD |d 1998-07-24 |e P |k CAD |o 629.04 Tam P 1998 |p 98-02464 |r 2011-05-19 |t c.1 |w 1998-07-24 |y BKSC | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 629_040000000000000_TAM_P |7 0 |8 SIRKU |9 65080 |a PUSAT |b PUSAT |c CIRC |d 1998-07-24 |e P |k CIRC |l 18 |m 2 |o 629.04 Tam P |p 98-02465 |r 2023-02-20 |s 2023-02-08 |t 2 |w 1998-07-24 |y BKS | ||
952 | |0 0 |1 1 |2 ddc |4 0 |7 0 |8 SIRKU |9 66029 |a PUSAT |b PUSAT |c CIRC |d 1998-09-03 |e P |k CIRC |o 629.04 Tam P |p 98-03593 |t 3 |w 1998-09-03 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 629_040000000000000_TAM_P |7 0 |8 SIRKU |9 66030 |a PUSAT |b PUSAT |c CIRC |d 1998-09-03 |e P |k CIRC |l 26 |m 6 |o 629.04 Tam P |p 98-03594 |r 2023-12-07 |s 2023-11-22 |t 4 |w 1998-09-03 |y BKS | ||
952 | |0 0 |1 0 |2 ddc |4 0 |6 629_040000000000000_TAM_P |7 0 |8 SIRKU |9 66031 |a PUSAT |b PUSAT |c CIRC |d 1998-09-03 |e P |k CIRC |l 9 |o 629.04 Tam P |p 98-03595 |r 2024-05-11 |s 2019-02-20 |t 5 |w 1998-09-03 |y BKS |